Clever Green Cabinets have done it again !!
Jon Taylor first created a kitchen design that the client loved, then realized it by building, staining and installing the cabinetry. Clever Green first installed the base-cabinets unfinished with all the face frames to be able to template early. Jon’s team then removed the face frames and applied the stain and finish in their spray booth. This ensured a consistent finish.
Some of the cool products installed on this project are the Blue Star range, 8” wide oak flooring and Ashfield schist stone.
The icing on the cake for this project just came on site. The hand-made and painted backsplash tile from Tile Showcase that took 7 weeks to arrive and will be installed next week.
We will complete a project re-cap once the backsplash is installed.